Whoops!/WPPSS

Whoops!/WPPSS

Author: David Myhra

Publisher:

Published: 1984

Total Pages: 224

ISBN-13:

DOWNLOAD EBOOK


Book Synopsis Whoops!/WPPSS by : David Myhra

Download or read book Whoops!/WPPSS written by David Myhra and published by . This book was released on 1984 with total page 224 pages. Available in PDF, EPUB and Kindle. Book excerpt:


Nuclear Power And Ratepayer Protest

Nuclear Power And Ratepayer Protest

Author: Wayne H. Sugai

Publisher: Routledge

Published: 2019-03-13

Total Pages: 364

ISBN-13: 0429712340

DOWNLOAD EBOOK

In early 1982, the Washington Public Power Supply System (WPPSS) terminated two nuclear projects, triggering an episode of mass ratepayer insurgency throughout the state. In this survey of the crisis, Dr. Sugai analyzes the political and economic conditions that precipitated the protest and examines citizen opposition to the WPPSS nuclear venture b


Book Synopsis Nuclear Power And Ratepayer Protest by : Wayne H. Sugai

Download or read book Nuclear Power And Ratepayer Protest written by Wayne H. Sugai and published by Routledge. This book was released on 2019-03-13 with total page 364 pages. Available in PDF, EPUB and Kindle. Book excerpt: In early 1982, the Washington Public Power Supply System (WPPSS) terminated two nuclear projects, triggering an episode of mass ratepayer insurgency throughout the state. In this survey of the crisis, Dr. Sugai analyzes the political and economic conditions that precipitated the protest and examines citizen opposition to the WPPSS nuclear venture b


Energy Northwest

Energy Northwest

Author: Gary K. Miller

Publisher:

Published: 2001

Total Pages: 610

ISBN-13: 9781401013004

DOWNLOAD EBOOK

The nation is currently at the beginning of a serious energy crisis. For the electrical utility industry, it is the most serious crisis since the 1970s, with a shortfall in generating capacity and skyrocketing fuel prices. At the same time, legislation to deregulate the industry is stuck in Congress; rolling blackouts are plaguing California and threatening the Northwest; elected officials are frozen by ideology over good governance - and there is no end in sight. How did we get in this condition? In the Pacific Northwest, the answer to this and many related questions can be found in Energy Northwest: A History of the Washington Public Power Supply System. This work documents the joint operating agency made up of publicly owned utilities that became Energy Northwest. But for most of its existence the agency was known as the Washington Public Power Supply System - WPPSS, or, simply the Supply System. Its founders were veterans of years of conflict between their public utilities and the powerful private utilities of the region. Public power leaders hoped to provide their ratepayers reliable and affordable electricity, at the cost of production, for the future. Founded in 1957, the agency got into business by building and operating a small hydroelectric plant called the Packwood Lake Project located in the majestic Gifford Pinchot National Forest. Then in 1966, WPPSS built the Hanford Generating Project, a power facility that used the steam created by the N-reactor, a plutonium producing defense plant on the Hanford Reservation 25 miles north of Richland, Washington. The Supply System ran the plant for 20 years before the N-reactor shut down for good, taking away the source of steam from Hanford Generating Project. As Hanford Generating Project began to churn out power, in the late 1960s, the region initiated a planning process to build more thermal plants, since no more hydroelectric dams would be built. This ambitious effort - the Hydro-Thermal Power Plan - enthusiastically sponsored by the federal power marketing agency Bonneville Power Administration, envisioned up to 20 nuclear and coal powered plants in the Northwest. This frenzied effort was in response to the Energy Crisis of 1974 and the reliance on an outmoded energy forecasting system that projected power blackouts and economic chaos. Two nuclear power plants were eventually built and operated - Portland General Electric´s Trojan plant, near Ranier, Oregon, and WPPSS´s WNP-2, at Hanford. Others were planned, at Pebble Springs near Arlington, Oregon, and in the Skagit Valley in Northwest Washington, which were abandoned early on. But the major effort went into five nuclear power plants to be built and operated by the Washington Public Power Supply System. The Joint Power Planning Council, representing all the region´s utilities and hosted by Bonneville, and the Public Power Council asked WPPSS to build these plants and build them quickly. Two were to be located on a forested hilltop near Satsop, in western Washington, and three at the remote Hanford Reservation. Of these only WNP-2 (now renamed Columbia Generating Station) was completed. Since it began commercial operation in 1985, the plant produces 1,150 net megawatts of electricity at full power, enough to serve the greater Seattle area. The other four were mothballed and later terminated in various stages of completion after years of construction woes and stunning cost overruns. The ratepayers of the Northwest continue to pay off the revenue bonds for three of those - WNP-1, WNP-3, and Columbia Generating Station - through a financial arrangement with Bonneville. The Supply System defaulted on the bonds for the other two - WNP-4 and WNP-5 - to the tune of $2.25 billion, the largest municipal bond default in U.S. history to that time. The aftermath of this disaster was extremely damaging, not only for those bondholders who received only pennies on the dollar after years


Book Synopsis Energy Northwest by : Gary K. Miller

Download or read book Energy Northwest written by Gary K. Miller and published by . This book was released on 2001 with total page 610 pages. Available in PDF, EPUB and Kindle. Book excerpt: The nation is currently at the beginning of a serious energy crisis. For the electrical utility industry, it is the most serious crisis since the 1970s, with a shortfall in generating capacity and skyrocketing fuel prices. At the same time, legislation to deregulate the industry is stuck in Congress; rolling blackouts are plaguing California and threatening the Northwest; elected officials are frozen by ideology over good governance - and there is no end in sight. How did we get in this condition? In the Pacific Northwest, the answer to this and many related questions can be found in Energy Northwest: A History of the Washington Public Power Supply System. This work documents the joint operating agency made up of publicly owned utilities that became Energy Northwest. But for most of its existence the agency was known as the Washington Public Power Supply System - WPPSS, or, simply the Supply System. Its founders were veterans of years of conflict between their public utilities and the powerful private utilities of the region. Public power leaders hoped to provide their ratepayers reliable and affordable electricity, at the cost of production, for the future. Founded in 1957, the agency got into business by building and operating a small hydroelectric plant called the Packwood Lake Project located in the majestic Gifford Pinchot National Forest. Then in 1966, WPPSS built the Hanford Generating Project, a power facility that used the steam created by the N-reactor, a plutonium producing defense plant on the Hanford Reservation 25 miles north of Richland, Washington. The Supply System ran the plant for 20 years before the N-reactor shut down for good, taking away the source of steam from Hanford Generating Project. As Hanford Generating Project began to churn out power, in the late 1960s, the region initiated a planning process to build more thermal plants, since no more hydroelectric dams would be built. This ambitious effort - the Hydro-Thermal Power Plan - enthusiastically sponsored by the federal power marketing agency Bonneville Power Administration, envisioned up to 20 nuclear and coal powered plants in the Northwest. This frenzied effort was in response to the Energy Crisis of 1974 and the reliance on an outmoded energy forecasting system that projected power blackouts and economic chaos. Two nuclear power plants were eventually built and operated - Portland General Electric´s Trojan plant, near Ranier, Oregon, and WPPSS´s WNP-2, at Hanford. Others were planned, at Pebble Springs near Arlington, Oregon, and in the Skagit Valley in Northwest Washington, which were abandoned early on. But the major effort went into five nuclear power plants to be built and operated by the Washington Public Power Supply System. The Joint Power Planning Council, representing all the region´s utilities and hosted by Bonneville, and the Public Power Council asked WPPSS to build these plants and build them quickly. Two were to be located on a forested hilltop near Satsop, in western Washington, and three at the remote Hanford Reservation. Of these only WNP-2 (now renamed Columbia Generating Station) was completed. Since it began commercial operation in 1985, the plant produces 1,150 net megawatts of electricity at full power, enough to serve the greater Seattle area. The other four were mothballed and later terminated in various stages of completion after years of construction woes and stunning cost overruns. The ratepayers of the Northwest continue to pay off the revenue bonds for three of those - WNP-1, WNP-3, and Columbia Generating Station - through a financial arrangement with Bonneville. The Supply System defaulted on the bonds for the other two - WNP-4 and WNP-5 - to the tune of $2.25 billion, the largest municipal bond default in U.S. history to that time. The aftermath of this disaster was extremely damaging, not only for those bondholders who received only pennies on the dollar after years


Illusions of Power

Illusions of Power

Author: D. Victor Anderson

Publisher: Greenwood

Published: 1985

Total Pages: 184

ISBN-13:

DOWNLOAD EBOOK


Book Synopsis Illusions of Power by : D. Victor Anderson

Download or read book Illusions of Power written by D. Victor Anderson and published by Greenwood. This book was released on 1985 with total page 184 pages. Available in PDF, EPUB and Kindle. Book excerpt:


Bonneville Power Administration (BPA) and Washington Public Power Supply System (WPPSS): Bonneville Power Administration direct acquisition of Washington Public Power Supply System (WPPSS) nuclear projects nos. 1, 2, and 3

Bonneville Power Administration (BPA) and Washington Public Power Supply System (WPPSS): Bonneville Power Administration direct acquisition of Washington Public Power Supply System (WPPSS) nuclear projects nos. 1, 2, and 3

Author: United States. Congress. House. Committee on Interior and Insular Affairs. Subcommittee on Mining, Forest Management, and Bonneville Power Administration

Publisher:

Published: 1985

Total Pages: 434

ISBN-13:

DOWNLOAD EBOOK


Book Synopsis Bonneville Power Administration (BPA) and Washington Public Power Supply System (WPPSS): Bonneville Power Administration direct acquisition of Washington Public Power Supply System (WPPSS) nuclear projects nos. 1, 2, and 3 by : United States. Congress. House. Committee on Interior and Insular Affairs. Subcommittee on Mining, Forest Management, and Bonneville Power Administration

Download or read book Bonneville Power Administration (BPA) and Washington Public Power Supply System (WPPSS): Bonneville Power Administration direct acquisition of Washington Public Power Supply System (WPPSS) nuclear projects nos. 1, 2, and 3 written by United States. Congress. House. Committee on Interior and Insular Affairs. Subcommittee on Mining, Forest Management, and Bonneville Power Administration and published by . This book was released on 1985 with total page 434 pages. Available in PDF, EPUB and Kindle. Book excerpt:


WPPSS (Washington Public Power Supply System) Nuclear Project No.3, Operation

WPPSS (Washington Public Power Supply System) Nuclear Project No.3, Operation

Author:

Publisher:

Published: 1985

Total Pages: 20

ISBN-13:

DOWNLOAD EBOOK


Book Synopsis WPPSS (Washington Public Power Supply System) Nuclear Project No.3, Operation by :

Download or read book WPPSS (Washington Public Power Supply System) Nuclear Project No.3, Operation written by and published by . This book was released on 1985 with total page 20 pages. Available in PDF, EPUB and Kindle. Book excerpt:


Washington Public Power Supply System Units 3,5

Washington Public Power Supply System Units 3,5

Author:

Publisher:

Published: 1975

Total Pages: 200

ISBN-13:

DOWNLOAD EBOOK


Book Synopsis Washington Public Power Supply System Units 3,5 by :

Download or read book Washington Public Power Supply System Units 3,5 written by and published by . This book was released on 1975 with total page 200 pages. Available in PDF, EPUB and Kindle. Book excerpt:


Nuclear Implosions

Nuclear Implosions

Author: Daniel Pope

Publisher: Cambridge University Press

Published: 2011-02-17

Total Pages: 0

ISBN-13: 9780521179744

DOWNLOAD EBOOK

Nuclear Implosions tells the story of a state government agency's failed attempt in the 1970s to build five large nuclear power stations in the Pacific Northwest of the United States. Facing huge cost overruns and long construction delays, the agency completed only one plant and found itself unable to repay a $2.25 billion of municipal bonds. These projects reflect the tangled relationships between American nuclear power and nuclear weaponry, the emerging era of limits, and the nation's troubled attempts to resolve conflicts through complex legal cases.


Book Synopsis Nuclear Implosions by : Daniel Pope

Download or read book Nuclear Implosions written by Daniel Pope and published by Cambridge University Press. This book was released on 2011-02-17 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: Nuclear Implosions tells the story of a state government agency's failed attempt in the 1970s to build five large nuclear power stations in the Pacific Northwest of the United States. Facing huge cost overruns and long construction delays, the agency completed only one plant and found itself unable to repay a $2.25 billion of municipal bonds. These projects reflect the tangled relationships between American nuclear power and nuclear weaponry, the emerging era of limits, and the nation's troubled attempts to resolve conflicts through complex legal cases.


Washington Public Power Supply System Nuclear Projects 1 & 4

Washington Public Power Supply System Nuclear Projects 1 & 4

Author:

Publisher:

Published: 1974

Total Pages: 182

ISBN-13:

DOWNLOAD EBOOK


Book Synopsis Washington Public Power Supply System Nuclear Projects 1 & 4 by :

Download or read book Washington Public Power Supply System Nuclear Projects 1 & 4 written by and published by . This book was released on 1974 with total page 182 pages. Available in PDF, EPUB and Kindle. Book excerpt:


WPPSS Nuclear Project No. 1 and No. 4

WPPSS Nuclear Project No. 1 and No. 4

Author: Faye H. Horn

Publisher:

Published: 1975

Total Pages: 28

ISBN-13:

DOWNLOAD EBOOK


Book Synopsis WPPSS Nuclear Project No. 1 and No. 4 by : Faye H. Horn

Download or read book WPPSS Nuclear Project No. 1 and No. 4 written by Faye H. Horn and published by . This book was released on 1975 with total page 28 pages. Available in PDF, EPUB and Kindle. Book excerpt: